TechTiera
TechTiera
TechTiera CorporationTechTiera Corporation

HomeSolutionsEngineering Content Hub

For asset-intensive organizations modernizing or replacing engineering document management

One controlled engineering record, for the life of the asset.

ECH360 by TechTiera is a project-to-asset engineering information management solution powered by Hyland Alfresco. It connects MDR-driven project delivery, engineering WIP, EPC and vendor collaboration, review and approval, authoritative master records, asset and equipment context, operations and future brownfield change.

ECH360 = TechTiera engineering solution layer  ·  Hyland Alfresco = enterprise content platform foundation

ECH360, Engineering Content Hub by TechTiera

Powered by
Hyland
Alfresco

01Project Workspace + MDR

02Master Records / Engineering Vault

03Asset / Equipment Context

04Operations

What is ECH360?

Project-to-asset engineering information management on Hyland Alfresco

ECH360 combines a pre-built engineering information model, modular business capabilities and controlled workflows on the Hyland Alfresco platform. It is configured to your document classes, numbering, metadata, approval chain, organizational model and asset structure. Configuration first, with customization only where specific behavior requires it.

In practitioner terms: the register, the documents, the review, the transmittal and the as-built all live in one place, and that place knows which revision is current, who approved it, when it was sent, to whom, and what it’s attached to.

From the first FEED deliverable to a modification made twenty years into operations.

What TechTiera brings

Project and asset workspace templates, the engineering information model, MDR and SMDR registers, review and transmittal workflows, handover controls, dashboards and integration patterns. Configured to your operating model, not coded from a blank page.

What Alfresco brings underneath

The content repository, versioning, permissions, full-text and metadata search, process integration, governance options, open APIs, and a deployment model your IT team can support and upgrade.

Where teams start

With the module that has a date attached, usually register control, transmittals, or an approaching handover milestone. The other five wait for the next project or the next audit.

The lifecycle

The MDR controls project deliverables while authoritative master records remain separate from asset context

The project workspace provides the business context and the MDR acts as the planned and controlled deliverable register. Documents are created and revised in WIP, reviewed, approved and issued through controlled transmittals. Accepted as-built information becomes the current authoritative master record, which is then linked to persistent facility, system, equipment and tag context for operations and future modification projects.

Project work on an upper level, dropping to the record level at handover Project Workspace + MDR handover Master Records / Vault Asset Context & Operations
1
Project Workspace + MDR

Establish project context, team, metadata and planned engineering deliverables.

2
Engineering WIP

Create, receive and revise documents and drawings against controlled deliverables.

3
Review & Approval

Capture technical review, markups, comments, responses, decisions and approvals.

4
Revision & Transmittal

Control revisions and formal exchanges with revision-aware issue history.

5
Approved / As-Built

Validate completeness, acceptance evidence and final handover readiness.

6
Master Records / Vault

Create the current authoritative approved engineering record with project lineage.

7
Asset Context & Operations

Link current masters to facility, system, equipment and tags for operations and future change.

ECH360 operating model

Project delivery, authoritative records and asset context are related, but deliberately not the same thing

ECH360 separates temporary project work from the long-lived engineering record. The MDR remains inside the project as the planned deliverable control layer; accepted as-built information is promoted to Master Records / Engineering Vault; asset and equipment workspaces provide the persistent operational context for those authoritative records.

Project Workspaces

Project business context for people, content, data and tasks.

  • Project metadata and team
  • MDR / SMDR planned deliverables
  • Engineering WIP and revisions
  • Review / approval and markups
  • Transmittals and close-out

Master Records / Engineering Vault

The current authoritative approved engineering record.

  • Approved / as-built documents
  • Current controlled revision
  • Project lineage retained
  • Read-only / governed master use
  • Controlled basis for future revision

Asset / Equipment Context

Persistent engineering context that can outlive many projects.

  • Facility / plant
  • System
  • Equipment
  • Engineering tag
  • Operations and maintenance access

Project Workspace + MDR → Engineering WIP → Review / Approval → Approved / As-Built → Master Records / Engineering Vault → Asset / Equipment Context → Operations → Future Modification Project

Shared foundation: Engineering Information Model · Workflow · Search · Security · Governance · Audit · Retention · Integration

Six modular capabilities

Adopt together or phase them around your business priorities

All six capabilities share the same engineering information model, security, search and governance foundation. They can be deployed together or phased around project, handover, compliance and operational priorities.

Upper tier · Project work

Capital Projects Documentation

The project record, from a governed template rather than from somebody’s old folder. Template-based project workspaces with discipline hierarchies. A master document register (MDR and SMDR) with deliverable planning and forecast submission dates. Document and drawing registration, configurable numbering, metadata validation at the point of capture, controlled review and approval, markups and comment-response sheets, deadline notifications, project dashboards and a closeout process that has to be satisfied rather than declared.

Used daily by document control and project controls on a live project. Read weekly by the engineering manager and the project manager.

Lower tier · Master records

Asset Documentation

The persistent operational context for authoritative engineering information, organised by plant rather than by project. Master Records / Engineering Vault retains the current approved engineering record; asset workspaces organise access through field, facility, system, equipment and tag context, linked back to the originating project and forward to later modifications.

Used by maintenance and reliability engineers, asset and plant information managers, and the next project team that needs to know what is actually installed.

The evidence layer

Transmittals Management

Who sent what, to whom, on which date, at which revision. Incoming, outgoing and internal transmittals with configurable numbering and cover sheets. Package validation before issue, recipient and distribution controls, acknowledgements, revision-aware document lists, and a complete transmission history held as a record in its own right.

Owned by document control. Relied on by anyone who has had to prove a document was issued, and by commercial teams when a claim is being argued.

Compliance content

QHSE Hub

Governed compliance content, with an owner and a review date on every item. Policies, plans, permits, inspections, risk assessments, incident records and corrective actions. Each item carries ownership, a review cycle, approval history and permissions that match who is actually allowed to see it.

Used by QHSE managers and HSE document controllers. Read by site supervisors, and by whoever sits opposite the auditor.

Often the quiet win

SOP Hub

Controlled procedures, and supersession that actually supersedes. Controlled authoring, review, approval, publication and periodic review of procedures and work instructions, with supersession control so a retired version stops being findable as if it were current.

Used by operations supervisors and training and competence teams. Owned by the technical authority for each procedure.

Closes the loop

Management of Change

Change on a live asset, with the document updates inside the change rather than after it. Configurable initiation, technical assessment, impact review, approval and closure workflows, with closeout blocked until affected documents are actually updated.

Run jointly by operations, engineering and QHSE. Owned in practice by the MOC coordinator, and audited by whoever answers to the regulator.

See ECH360 against your own engineering scenario.

Book a Walkthrough

Under all six modules, the same eight things

Properties of the platform and information model rather than features of one module.

Adopting a second module later doesn’t mean configuring all of this again.

Information model

Configurable document classes, mandatory/optional metadata, controlled vocabularies, your own naming conventions.

Document control

Single/bulk upload, check-in/check-out, version and revision history as two separate ideas, status control.

Search & discovery

Full-text and metadata search, faceted filters, saved views, OCR-enabled discovery where configured.

Engineering review

Online markup and annotation, concurrent/sequential review, consolidated comments, response tracking.

Security & governance

Role-, organization-, workspace- and project-scoped access, with document-level restrictions where required, plus audit history and controlled external collaboration.

Reporting

MDR progress, overdue submissions, review aging, transmittal status, handover completeness, configurable KPIs.

Integration

API-led patterns for ERP, EAM, CMMS, project controls, identity services and BI/reporting.

ECH360

Enterprise-to-project governance

Organization onboarding is centrally governed; project access is locally administered

ECH360 separates enterprise administration, business-unit control and project-level access so internal teams, EPC organizations and vendors can collaborate without weakening accountability or project boundaries.

Nested governance scopes, with an external organization admitted at two separate points Enterprise Workspace Business Unit Project Workspace External organization

Enterprise Workspace

Super Administrator

  • Platform and global configuration
  • Business Unit administration
  • Enterprise security, audit and integration oversight

Business Unit

Business Administrator

  • Business Unit configuration and standards
  • Projects and templates
  • External organization administration
  • EPC and Vendor/Supplier onboarding

Project Workspace

Project Administrator / Project DCM

  • Project members and roles
  • Project-specific permissions
  • Workflow and document-control administration
  • EPC and vendor access within approved scope
EPC Organization

Business-unit administration approves the EPC organization. The Project Administrator assigns approved EPC users to the project. EPC DCM coordinates EPC engineers, procurement and operational disciplines within the authorized scope.

Vendor / Supplier Organization

Vendor organizations and identities are governed centrally, while project administrators assign scope-specific access for submissions, comment responses, transmittals and deliverable collaboration.

Governance principles: Least privilege · Segregation of duties · Project-scope enforcement · Controlled external collaboration · Lifecycle access review · Full audit and traceability

Architecture and deployment

Four layers, and it’s clear which two are ours

Nothing in the stack is a black box. Every layer is something your IT team can read, support and upgrade. Configuration first, customization only where a specific behavior requires it.

TechTiera
Experience layer

Role-based project, asset, document control, contractor, QHSE and SOP experiences, with dashboards and task views.

TechTiera
Solution services

Workspace templates, numbering, metadata rules, MDR/SMDR, review workflows, transmittals, handover controls, notifications and reports.

Hyland Alfresco
Content platform

Content Services (repository, metadata, versioning, audit, security), Digital Workspace, process/workflow services and enterprise search, with OCR where configured.

Already yours
Enterprise ecosystem

Identity and access management, ERP, EAM, CMMS, project controls, email/collaboration, BI, e-signature (integrated with, not replaced).

Deployment: customer-managed, private-cloud and cloud patterns can all be considered, depending on the Alfresco edition, your architecture standards, data-residency rules and commercial model, confirmed during discovery, not assumed up front.

Who it’s for

Three kinds of organization, one shared record



Owners & Operators

Capital projects and asset information. You fund the project and inherit the record. Project WIP and the master asset record stay separate, so what operations inherits is what engineering approved.

EPC & EPCM Teams

Engineering deliverables and contractor collaboration. Graded on submission dates and review turnaround; MDR status is reported from the record instead of reassembled for a report.

Operations & Compliance

MOC, QHSE, SOPs and audit-ready records. What’s current, who approved it, and whether a change to the plant also changed its documents, all answerable from the record itself.

Where this fits, and where it’s more than you need

Built for this

A handover, phase completion or turnover milestone inside the next 12 months, with an as-built package operations has to accept before the project can close out.
Multi-discipline capital projects where contractor and vendor submissions run against an MDR and need a recorded review, comment and resubmission cycle.
An asset base that outlives the projects that built it, where operations opens a document from the equipment tag years later.
Audit, regulatory or insurer evidence that has to be produced long after handover, from documents that still carry their approval evidence and revision history.

More than you need today

One small project, one contractor, a few hundred documents, and a controller who knows where all of them are.
No numbering or classification standard yet. The first job there is writing one, and that’s a shorter piece of work.
A records set that genuinely doesn’t change after handover.

See ECH360 against your own engineering scenario.

Book a Walkthrough

Industries

Built for engineering-intensive, asset-heavy industries

ECH360 is designed for capital-intensive, drawing-heavy environments where engineering information must remain controlled from project delivery through long-term operations.

We lead with the sectors where TechTiera has the strongest engineering document-control relevance.

Marine, Offshore & Heavy Fabrication

Shipyards, offshore fabricators, FPSO and topsides, rig builders, naval and defense yards. Extreme drawing volume per hull or unit and a contractual delivery date that doesn’t move.

Oil & Gas, LNG and Process Plant

Oil and natural gas, LNG, refining, chemicals, power and utilities, water and wastewater. A permanent brownfield asset base and MOC as a standing legal obligation.

Industrial Manufacturing Capital Projects

Automotive, building materials, glass and packaging, heavy engineering, semiconductor and advanced manufacturing. Many concurrent plant and line projects, no two set up the same way.

Also serves:

Mining, metals & minerals
Renewable energy
Transportation infrastructure
Civil & urban infrastructure
Datacenters & digital infrastructure
Buildings & real estate
Pharmaceuticals & life sciences
Defense & aerospace
Environmental & waste management
Agriculture & food infrastructure

Proof

Recognized by Hyland. Delivered in the industries this is built for.

Hyland Partner of the Year, APAC, Rising Star

Hyland APAC Partner of the Year 2025, Rising Star

Third-party recognition of the Hyland partnership, not a customer reference for this specific solution.

Hyland
Platform partnership & recognition
ECM
Enterprise content management experience
Global
Distributed delivery capability
24×7
Support model available by engagement

What we’re not going to claim: ECH360 is positioned as TechTiera’s engineering solution layer on Hyland Alfresco. Product-specific customer references and quantitative outcomes should be used only where separately approved and evidenced. Evaluate the solution through a working session against your own project, MDR, handover or asset scenario.

See ECH360 against your own engineering scenario

Bring one real project, MDR, handover or asset scenario. We will map it against the ECH360 project-to-asset model using your numbering, metadata and document-control requirements.

Or book by email: info@techtiera.com