TechTiera
TechTiera
TechTiera CorporationTechTiera Corporation

For asset-intensive organizations modernizing engineering information management

One controlled engineering record, for the life of the asset.

ECH360 by TechTiera is a project-to-asset engineering information management solution powered by Hyland Alfresco. It connects MDR-driven project delivery, engineering WIP, EPC and vendor collaboration, review and approval, authoritative master records, asset and equipment context, operations and future brownfield change.

ECH360 Engineering Content Hub by TechTiera

Powered by
Hyland
Alfresco
Many documents become one controlled record that persists

We would rather show it to you than describe it

Bring one of your own scenarios and we will run the whole line against it.

One project workspace, one asset record, one controlled handover, end to end. Twenty minutes, no slide deck. You can use your own numbering convention and document types so you are watching your environment, not a demo dataset.

Book a walkthrough →

What is ECH360?

Project-to-asset engineering information management on Hyland Alfresco

ECH360 combines a pre-built engineering information model, modular business capabilities and controlled workflows on the Hyland Alfresco platform. It is configured to your document classes, numbering, metadata, approval chain, organizational model and asset structure: configuration first, with customization only where specific behavior requires it.

In practitioner terms: the register, the documents, the review, the transmittal and the as-built all live in one place, and that place knows which revision is current, who approved it, when it was sent, to whom, and what it’s attached to.

From the first FEED deliverable to a modification made twenty years into operations.

ECH360

ECH360 by TechTieraA configurable engineering solution layer on Hyland Alfresco, not a generic folder structure and not a replacement for your ERP, EAM or project-control systems.

What TechTiera brings

Project and asset workspace templates, the engineering information model, MDR and SMDR registers, review and transmittal workflows, handover controls, dashboards and integration patterns. Configured to your operating model, not coded from a blank page.

What Alfresco brings underneath

The content repository, versioning, permissions, full-text and metadata search, process integration, governance options, open APIs and a deployment model your IT team can support and upgrade. Open and API-led, which matters when this has to outlive the project that funded it.

Where teams start

With the module that has a date attached. Usually register control, transmittals, or an approaching handover milestone. The other five wait for the next project or the next audit. Nobody adopts the whole lifecycle on day one.

Why engineering teams change

When the register, the document, the revision and the asset stop agreeing, control becomes manual

ECH360 is designed for the point where shared drives, email, spreadsheets and disconnected repositories can no longer reliably answer which deliverable is due, which revision is current, who approved it, what was transmitted, or which asset the final record belongs to.

Project delivery pressure

MDR dates, contractor submissions, review cycles and transmittals need one governed status rather than separate trackers.

Handover risk

Approved as-built content must cross a controlled gate into authoritative master records with completeness, lineage and evidence intact.

Operations continuity

The asset can outlive many projects, so operations needs current master information linked to facility, system, equipment and tag context.

The plant outlives the project that built it. The record has to last as long as the plant.

One approved as-built, promoted into the master records with its revision history and its transmittal trail still attached, and read against the equipment tag by whoever is on shift twenty years from now.

Recognisable ground

Two conditions of the work, and the control that answers each one

Illustrative, not a client screenshot. Both will be familiar to anyone who has run document control on a live project. The caption under each one names what the information model does about it.

Documents (P:) › Projects › P-4471 › Drawings
P-4471-PID-002_RevB.pdf
P-4471-PID-002_RevB_marked.pdf
P-4471-PID-002_RevC_DRAFT.pdf
P-4471-PID-002_RevC_final_FINAL(2).pdf
PID 002 latest.pdf
_OLD / _do not use / from vendor 14-03/
Controlled revisions: one revision is current, and the revision history records every issue and every access against it.

MDR_master_v11_JS_edit.xlsx
Document Register Actual Status
P-4471-PID-002 Rev B Rev C out of step
P-4471-DS-118 Rev A not found missing
P-4471-SPC-007 Rev C Rev C in step
P-4471-VM-233 not reg’d Rev 1 unregistered
The register and the documents are the same object, so status does not drift between them, and handover completeness is read straight off it.

The lifecycle

The MDR controls project deliverables while authoritative master records remain separate from asset context

The project workspace provides the business context and the MDR acts as the planned and controlled deliverable register. Documents are created and revised in WIP, reviewed, approved and issued through controlled transmittals. Accepted as-built information becomes the current authoritative master record, which is then linked to persistent facility, system, equipment and tag context for operations and future modification projects.

The project stage on an upper level, stepping down to the record at handover Project Workspace + MDR handover Master Records / Engineering Vault Asset / Equipment Context Operations
The project stage on an upper level, stepping down to the record at handover Project Workspace + MDR handover Master Records / Engineering Vault Asset / Equipment Context Operations
Accepted as-built information becomes the current authoritative master record. Everything after the step down sits on the other side of that boundary.
North field debottleneck
Tank farm expansion
Compressor overhaul

North field
└ Gas processing plant
└ Compression system
└ 3400-P-01B: PID-2200-0014, Rev C, approved · DS-3400-0071, Rev B, approved · ASB-2200-0007, Rev 1, as built

Down: validated documents accepted into master records, with revision history and transmittal trail attached. Up: operations and the next project draw the current record from the asset itself. (Illustrative, numbers and tag invented for this drawing.)

1
Project Workspace + MDR

Establish project context, team, metadata and planned engineering deliverables.

2
Engineering WIP

Create, receive and revise documents and drawings against controlled deliverables.

3
Review & Approval

Capture technical review, markups, comments, responses, decisions and approvals.

4
Revision & Transmittal

Control revisions and formal exchanges with revision-aware issue history.

5
Approved / As-Built

Validate completeness, acceptance evidence and final handover readiness.

6
Master Records / Vault

Create the current authoritative approved engineering record with project lineage.

7
Asset Context & Operations

Link current masters to facility, system, equipment and tags for operations and future change.

ECH360 Operating Model

Project delivery, authoritative records and asset context are related, but deliberately not the same thing

The MDR remains inside the project as the planned deliverable control layer; accepted as-built information is promoted to Master Records / Engineering Vault; asset and equipment workspaces provide the persistent operational context for those authoritative records.

Where work happens

Project Workspaces

Project business context for people, content, data and tasks.

  • Project metadata and team
  • MDR / SMDR planned deliverables
  • Engineering WIP and revisions
  • Review / approval and markups
  • Transmittals and close-out

What is authoritative

Master Records / Engineering Vault

The current authoritative approved engineering record.

  • Approved / as-built documents
  • Current controlled revision
  • Project lineage retained
  • Governed master use
  • Controlled basis for future revision

What it is attached to

Asset / Equipment Context

Persistent engineering context that can outlive many projects.

  • Facility / plant
  • System
  • Equipment
  • Engineering tag
  • Operations and maintenance access

Project Workspace + MDR → Engineering WIP → Review / Approval → Approved / As-Built → Master Records / Engineering Vault → Asset / Equipment Context → Operations → Future Modification Project
Shared foundation: Engineering Information Model · Workflow · Search · Security · Governance · Audit · Retention · Integration

Where this fits, and where it’s more than you need

Built for this

A handover, phase completion or turnover milestone inside the next 12 months, with an as-built package operations has to accept before the project can close out.
Multi-discipline capital projects where contractor and vendor submissions run against an MDR and need a recorded review, comment and resubmission cycle.
An asset base that outlives the projects that built it, where operations opens a document from the equipment tag years later.
Change on a live asset that has to be linked to every drawing, procedure and tag it touches, and closed with the records updated.
Audit, regulatory or insurer evidence that has to be produced long after handover, from documents that still carry their approval evidence and revision history.

More than you need today

One small project, one contractor, a few hundred documents, and a controller who knows where all of them are.
No numbering or classification standard yet. The first job there is writing one, and that is a shorter piece of work.
A records set that genuinely does not change after handover.

If your situation is in the right-hand column, say so on the call.

We will tell you what the shorter piece of work is instead, and there is no charge for finding that out.

Find out which column you are in before you spend a budget cycle on it.

Book the Readiness Review

Who it is for

Three kinds of organisation, and the eleven stakeholders who work the same record

Engineering document control has a wide buying committee, and the reason it is wide is that a document passes through most of it. Their needs converge on the same six things: fast search, simple workflows, secure collaboration, auditability, data integrity and compliance.

Owners and Operators

Capital projects and asset information. You fund the project and you inherit the record. Project work in progress and the master asset record stay separate, so what operations inherits is what engineering approved.

EPC and EPCM Teams

Engineering deliverables and contractor collaboration. You are graded on submission dates, review turnaround and a turnover package. MDR status is reported from the record instead of reassembled for the report.

Operations and Compliance

MOC, QHSE, SOPs and audit-ready records. You run the asset after handover. What is current, who approved it, and whether a change to the plant also changed its documents are all answerable from the record itself.

Five access principles the same record is held under

Role-based access. What someone can see and do follows the role they hold, rather than a folder permission set once and inherited forever.
Classification-based access. Document class and confidentiality carry rules of their own, governed by what it is, not where it sits.
Need to know. Contractors and vendors are scoped to the documents that concern them, down to document level.
Anytime and anywhere. The same record read from web, desktop or mobile, including from a control room desk or a walkdown.
Full audit and traceability. Every access, issue, comment and approval recorded against the record itself.

The stakeholder map, by group

Sets the standard, funds the work, and inherits the record at the end of it.

Executive sponsor and governance

Owns the mandate, the standard and the funding. Needs a defensible position on record completeness without reading the register personally.

Project manager, execution oversight

Needs progress and review status read off the record rather than reassembled for the weekly report.

Document controller

Runs the MDR and metadata, the documents and transmittals. Needs numbering validated at capture.

Engineer and lead engineer, reviewer

Needs the current revision and the whole comment history in one place.

Project manager, approver

Needs the approval evidence to outlast the project that produced it.

Procurement engineer and expeditor

Needs the outstanding list to be a live view of the register.

Submits into your standard, and is graded on how well it lands.

EPC engineer, submitter

Needs the submission requirement stated up front and a traceable response against every comment raised.

EPC document controller

Needs one place where the status is the status.

Contributes a small part of the record that handover cannot be signed without.

Vendor and supplier representative

Needs access scoped to the documents that concern them, and acknowledgement of what was received.

Reads the record for the whole life of the asset.

Operations and maintenance engineer

Needs to search against the tag, the equipment and the system, and find as-builts, manuals and modification history attached to the thing they belong to.

Keeps it supportable, integrated and upgradeable.

System administrator

One Alfresco-based architecture with a common security model, identity integration, API-led integration to ERP/EAM/CMMS, full audit history, and a documented upgrade path.

Bring your own project and we will map these eleven roles onto it in one session.

Book the Readiness Review

Enterprise-to-Project Governance

Organization onboarding is centrally governed; project access is locally administered

ECH360 separates enterprise administration, business-unit control and project-level access so internal teams, EPC organizations and vendors can collaborate without weakening accountability or project boundaries.

Nested governance scopes, with an external organization admitted at two separate points Enterprise Workspace Business Unit Project Workspace External organization
Organization onboarding is centrally governed; project access is locally administered. The path stops at the business unit boundary and starts again, amber, at the point where access is delegated.

Enterprise Workspace

Super Administrator

  • Platform and global configuration
  • Business Unit administration
  • Enterprise security, audit and integration oversight

Business Unit

Business Administrator

  • Business Unit configuration and standards
  • Projects and templates
  • External organization administration
  • EPC and Vendor/Supplier onboarding

Project Workspace

Project Administrator / Project DCM

  • Project members and roles
  • Project-specific permissions
  • Workflow and document-control administration
  • EPC and vendor access within approved scope
EPC Organization

Business-unit administration approves the EPC organization. The Project Administrator assigns approved EPC users to the project. EPC DCM coordinates engineers, procurement and operational disciplines within authorized scope.

Vendor / Supplier Organization

Vendor organizations and identities are governed centrally, while project administrators assign scope-specific access for submissions, comment responses, transmittals and deliverable collaboration.

Governance principles: Least privilege · Segregation of duties · Project-scope enforcement · Controlled external collaboration · Lifecycle access review · Full audit and traceability

Six modular capabilities

Adopt together or phase them around your business priorities

All six capabilities share the same engineering information model, security, search and governance foundation. They can be deployed together or phased around project, handover, compliance and operational priorities.

Upper tier, project work

Capital Projects Documentation

The project record, from a governed template rather than from somebody’s old folder. Template-based project workspaces with discipline hierarchies. A master document register (MDR and SMDR) with deliverable planning and forecast submission dates. Document and drawing registration, configurable numbering, metadata validation at the point of capture, controlled review and approval, markups and comment-response sheets, deadline notifications, project dashboards and a closeout process that has to be satisfied rather than declared.

Used daily by document control and project controls on a live project. Read weekly by the engineering manager and the project manager.

Lower tier, master records

Asset Documentation

The record operations actually works from, organised by plant rather than by project. Enterprise asset workspaces aligned to field, facility, system, equipment or a hierarchy you define yourself. Engineering, vendor and as-built records with controlled renditions alongside native files, cross-linked back to the originating project and forward to later modifications.

Used by maintenance and reliability engineers, asset and plant information managers, and the next project team that needs to know what is actually installed.

The evidence layer

Transmittals Management

Who sent what, to whom, on which date, at which revision. Incoming, outgoing and internal transmittals with configurable numbering and cover sheets. Package validation before issue, recipient and distribution controls, acknowledgements, revision-aware document lists, and a complete transmission history held as a record in its own right.

Owned by document control. Relied on by anyone who has had to prove a document was issued, and by commercial teams when a claim is being argued.

Compliance content

QHSE Hub

Governed compliance content, with an owner and a review date on every item. Policies, plans, permits, inspections, risk assessments, incident records and corrective actions. Each item carries ownership, a review cycle, approval history and permissions that match who is actually allowed to see it.

Used by QHSE managers and HSE document controllers. Read by site supervisors, and by whoever sits opposite the auditor.

Often the quiet win

SOP Hub

Controlled procedures, and supersession that actually supersedes. Controlled authoring, review, approval, publication and periodic review of procedures and work instructions, with supersession control so a retired version stops being findable as if it were current.

Used by operations supervisors and training and competence teams. Owned by the technical authority for each procedure.

Closes the loop

Management of Change

Change on a live asset, with the document updates inside the change rather than after it. Configurable initiation, technical assessment, impact review, approval and closure workflows, with closeout blocked until affected documents are actually updated.

Run jointly by operations, engineering and QHSE. Owned in practice by the MOC coordinator, and audited by whoever answers to the regulator.

Not sure which module has the deadline attached to it? That is the first question the session answers.

Book the Readiness Review

Under all six modules, the same seven things

Properties of the platform and the information model rather than features of one hub, which is why adopting a second module later does not mean configuring all of this again.

Information model

Configurable document classes, mandatory/optional metadata, controlled vocabularies, your own naming conventions. Legacy and new numbering can coexist.

Document control

Single/bulk upload, drag-and-drop registration, check-in/check-out, version and revision history as two separate ideas, status control.

Search & discovery

Full-text and metadata search, faceted filters, saved views, OCR-enabled discovery where configured, results that respect permissions.

Engineering review

Online markup and annotation, concurrent/sequential review, controlled offline re-upload, consolidated comments, response tracking.

Security & governance

Role-, organization-, workspace- and project-scoped access, with document-level restrictions where required, plus audit history, controlled external collaboration, watermarking and retention controls.

Reporting

MDR progress, overdue submissions, review aging, transmittal status, handover completeness, configurable KPIs.

Integration

API-led patterns for ERP, EAM, CMMS, project controls, identity services, collaboration, BI and reporting.

“Audit trail: no more ‘I didn’t get that document.’ File sharing and file opening is tracked by user. Transmittals are a matter of record and there’s no ‘delete’ function.”

Principal at a project management consultancy, describing document control on a $30M public-sector infrastructure project

Project deliverables
  • Engineering drawings
  • PFDs
  • P&IDs
  • Calculations
  • Datasheets
  • Specifications
Contractor and vendor records
  • Vendor manuals
  • Vendor certificates
  • Technical queries
  • Correspondence
  • Meeting minutes
  • Transmittals
Operations and compliance records
  • As-built records
  • Inspection & quality records
  • Permits
  • Risk assessments
  • SOPs
  • Work instructions

Industries

Built for engineering-intensive, asset-heavy industries

ECH360 is designed for capital-intensive, drawing-heavy environments where engineering information must remain controlled from project delivery through long-term operations. We lead with the sectors where TechTiera has the strongest engineering document-control relevance.

Marine, Offshore & Heavy Fabrication

Shipyards, offshore fabricators, FPSO and topsides, rig builders, naval and defence yards. Extreme drawing volume per hull or unit, class society and owner turnover packages, and a contractual delivery date that does not move.

Oil & Gas, LNG and Process Plant

Oil and natural gas, LNG, refining, chemicals and petrochemicals, power and utilities, water and wastewater. A permanent brownfield asset base and management of change as a standing legal obligation.

Industrial Manufacturing Capital Projects

Automotive, building materials, glass and packaging, heavy engineering, food processing, semiconductor and advanced manufacturing. Many concurrent plant and line projects, no two set up the same way.

The wider set the same modules cover

  • Mining, metals & minerals
  • Renewable energy
  • Transportation infrastructure
  • Civil & urban infrastructure
  • Datacenters & digital infrastructure
  • Buildings & real estate
  • Pharmaceuticals & life sciences
  • Defense & aerospace infrastructure
  • Environmental & waste management
  • Agriculture & food infrastructure

Same information model, same governance, different vocabulary. If your line is on this list, the honest first question is whether your document volumes and handover obligations justify a configured platform at all. The readiness review answers that before anyone writes a proposal.

Architecture and deployment

Four layers, and it’s clear which two are ours

TechTiera’s engineering information model, experiences, workflows, dashboards and integration patterns sit on the Alfresco Content Services foundation.

Nothing in the stack is a black box, and every layer of it is something your IT team can read, support and upgrade.

Configuration first, and customisation only where a specific behaviour requires it.

ours

TechTiera
Experience layer

Role-based project, asset, document control, contractor, MOC, QHSE and SOP experiences, with dashboards and task views. A document controller and a maintenance engineer do not get handed the same screen.

TechTiera
Solution services

Workspace templates, numbering, metadata rules, MDR and SMDR, review workflows, transmittals, handover controls, notifications and reports. This is the layer that makes the difference between a platform and a solution.

Hyland Alfresco
Content platform

Alfresco Content Services for the governed repository, metadata, versioning, audit and security. Alfresco Digital Workspace for the user experience. Process/workflow services and enterprise search & OCR.

Already yours
Enterprise ecosystem

Identity and access management, ERP, EAM, CMMS, project controls, email/collaboration, BI and e-signature. We integrate with these rather than asking you to retire them.

Named components in the stack

  • Alfresco Content Services
  • Alfresco Digital Workspace
  • Hyland process & workflow services
  • Enterprise search & OCR
  • REST APIs & integration layer

Deployment: Customer-managed, private-cloud and cloud patterns can all be considered. Which ones apply depends on the Alfresco edition selected, your architecture standards, data-residency rules and commercial model. High availability, disaster recovery, backup, monitoring and security controls are sized and designed for the specific deployment rather than quoted from a template.

[NEEDS: verified list from the Alfresco practice team]: confirmed editions, hosting regions and supported topologies. Deployment topology and performance sizing are confirmed during discovery and written into scope, which is the only place either of them can honestly be stated.

What we can actually show you

The proof, stated the way we would want it stated to us

Hyland APAC Partner of the Year 2025, Rising Star award badge

Hyland APAC Partner of the Year 2025, Rising Star

Third-party recognition of the Hyland partnership, the strongest independent evidence that exists for a solution this new. It is not a customer reference for this solution, and we are not going to present it as one.

200
Client engagements
150
Enterprise customers
10
Global offices & delivery centers
24×7
Support coverage, 365 days

An Alfresco practice that already exists

  • Alfresco Content Services configuration, customization, Activiti workflow and BPM development, integration and records management.
  • Managed services, health checks and performance work, 24x7x365, remote or onsite.
  • Practice headcount and certification count: [NEEDS: verified number]

Engineering document control delivered in the industries this is built for

  • Three oil and natural gas engagements: one platform modernization and two platform upgrades and implementations, one for an operator at major scale in APAC.
  • Implementation and long-run support for the largest ship building company in APAC.
  • Capital-project workspace provisioning automated for an industrial manufacturer.
  • Named enterprise clients in industrial and manufacturing sectors include Hilti, Tenneco, Federal-Mogul and Ardagh Glass.

Evidence discipline: ECH360 is positioned as TechTiera’s engineering solution layer on Hyland Alfresco. Product-specific customer references and quantitative outcomes should be used only where separately approved and evidenced. The most reliable way to evaluate fit is a working session against your own project, MDR, handover or asset scenario.

Customer success story

Engineering document control, delivered

An anonymized engineering EDMS case-study pattern showing the business challenge, solution design and expected project-to-asset outcomes that ECH360 is designed to support.

Oil & Natural Gas · Multi-Site Operator

From Fragmented Engineering Content to a Governed Project-to-Asset Record

How a multi-site oil and gas operator modernized document control, collaboration and asset information management with ECH360.

~1,500
Users in target operating model
Multi-site
Operating model
FEED→OPS
Lifecycle coverage
One
Governed record

“ECH360 replaced fragmented, folder- and email-driven document handling with a governed model connecting project work in progress, engineering decisions, approved master records and operational asset context.”

The Challenge, in one sentence

“Approved as-built records could be promoted into asset context with project lineage intact, supporting retrieval, maintenance decisions and future brownfield work.”

Results and Business Value: Operations-ready asset information

“ECH360 created a governed engineering information ecosystem connecting Project WIP → Approved Master Records → Asset Context → Operations, with security, metadata, version control, audit, retention and integration available as shared services.”

Lasting impact

How it runs

Five phases, in this order, for a reason

Configuration-led, not a code project. Each phase produces something you can review before the next one starts, and you can stop after any of them.

1
Discover

Confirm lifecycle scope, personas, document classes, registers, numbering, workflows, volumes, integrations and compliance evidence.

2
Configure

Build the information model, workspace templates, roles, workflows, search, dashboards and integration rules, in your terminology.

3
Pilot

One real project, one real asset, one real handover scenario. This is where a solution stops being a demo.

4
Roll out

Roll out the configured solution by project or business unit, onboard users, train teams and turn on governance.

5
Operate

Application support, administration, release management, optimization and roadmap. The same team that configured it keeps running it.

Typical duration per phase: [NEEDS: verified number]. We would rather leave this blank than quote a timeline before seeing your document volumes and integration list.

Before you spend a budget cycle on this

When this is the wrong answer

Two of the four situations below come up often enough that saying so early saves everyone a quarter.

When the decision to be made is a process decision

Document control works when someone has the authority to reject a deliverable at the gate. Configuration puts the gate in the path, names the criteria and holds the evidence. No software supplies the decision to say no at that gate.

When the fix is configuration in what you already run

If you already run a capable EDMS and the open item is numbering, review routing or reporting, the cheapest correct answer is usually to fix the configuration you own. We will say that in the readiness review, and we do not send a proposal after saying it.

When you are mid-project and the change is the wrong one

Numbering conventions are painful to change mid-project and usually should not be. Review routing, transmittal control and handover preparation can be improved at almost any point.

What we will not tell you

We will not tell you that this makes you compliant with anything. Records and retention depend on controls you define and evidence you produce. What a configured platform can do is support those controls and hold the evidence.

The offer

ECH360 Project-to-Asset Solution Workshop

Bring one real project, MDR, handover or asset scenario. We will map it against the ECH360 project-to-asset model using your numbering, metadata, document-control and governance requirements.

Handover completeness read

The acceptance criteria your package will actually be measured against, and which categories are currently unmet.

The blocking versus noise split

Most outstanding-document lists mix contractual blockers with items nobody will ever ask for. We separate them.

Operations-inheritance risk list

What becomes someone’s problem after sign-off, and what each item costs to fix now versus later.

A staged closeout sequence

What to fix in the next 30 days, what to negotiate into the handover agreement, and what to accept as a documented exception.

Book the Readiness Review

  • Scenario-led workshop
  • No documents needed from you
  • Deliverables yours to keep
  • Architecture and governance focused
  • Built on Hyland Alfresco
  • Support model by engagement
  • Global delivery capability

Handover coming up? Find out now what will be argued about later.

A completeness read, the blocking versus noise split, an operations risk list and a staged closeout sequence. Free, 60 minutes, yours to keep, no pitch.

Questions engineering and document control teams ask us first

What exactly is ECH360?

It’s a pre-built engineering document management system (EDMS) on Hyland Alfresco. Six modules, one information model, one security model, covering capital project documentation, asset documentation, transmittals, QHSE, SOPs, and management of change. Configured to your document classes, numbering and approval chain rather than coded from scratch.

This is a brand-new solution. What does that actually mean for us?

It means the six modules and the underlying engineering information model are newly packaged, but the platform underneath (Hyland Alfresco) and the team configuring it aren’t new to either Alfresco or engineering document control. What’s new is the pre-built configuration; what isn’t new is the delivery capability behind it.

Do we have to replace our existing EDMS to start?

No. Most teams start with one module (usually the one with a date attached, like transmittals or an approaching handover) running alongside what you already have. There’s no requirement to replace every existing repository or process on day one.

Which module do most teams start with?

Whichever one has a deadline attached. That’s usually Transmittals Management or Capital Projects Documentation ahead of a handover milestone. The other modules wait for the next project or the next audit. Nobody adopts the whole lifecycle at once, and we don’t recommend trying to.

Is this an Alfresco product or a TechTiera product?

Both, in the sense that matters. Alfresco Content Services and Digital Workspace are Hyland products underneath. The engineering information model, the six modules, the workflows and dashboards are TechTiera’s, built by our Alfresco practice, configured to your operating model, not bought off a shelf as a finished product.

What does the architecture look like, and where can it be deployed?

Four layers: your existing enterprise systems (ERP, EAM, CMMS, identity, etc.) at the base, the Hyland Alfresco content platform above that, TechTiera’s solution services above that, and the role-based experience layer on top. Deployment can be customer-managed, private cloud, or cloud, confirmed during discovery, not assumed up front.

What does engineering document control actually require, beyond storing the files?

Numbering and classification applied at the point of capture. A revision history that’s a record in its own right, not just a filename. Review and comment tracking with disposition codes. Transmittals that prove what was sent, to whom, when, and whether it was acknowledged. Validation gates before anything is promoted to master records. And retrieval by asset tag, not folder path, once it’s in operations.

We are mid-project. Is it too late to change anything?

Changing your numbering convention mid-project usually isn’t worth it. But review routing, transmittal control and handover preparation can be improved at almost any point in a project’s life. We’ll tell you which bucket your situation falls into in the readiness review, not after a proposal.

Our client mandates their EDMS for this project. Is this still useful?

Yes. Most EPC and vendor organizations run multiple clients’ mandated systems in parallel and still need their own internal control: MDR tracking, submission status, revision history and vendor coordination on their side of the fence. This can sit alongside a client-mandated system rather than replace it.

Do we have to share drawings or project documents for the readiness review?

No. The review runs on your description of the handover, the register, and the current state, not on your actual documents. Nothing is uploaded or reviewed as part of it.

Does this make us compliant with our industry standards?

No, and we won’t claim it does. Compliance depends on the controls you define and the evidence you produce. What a configured platform does is support those controls and hold the evidence reliably. Anything past that line is a statement about your process, not our product.

What does the readiness review cost, and what is the catch?

It’s free, 60 minutes, and there’s no requirement to engage us afterward. The four deliverables are yours to keep either way. The only “catch” is that we’ll tell you plainly if this isn’t the right fix for your situation.

Not ready to talk? Keep researching

What Does “As-Built” Actually Have to Mean at Handover?

Read the acceptance criteria →

Why Your Register and Your Drive Stop Agreeing

Read the seven control points →

What Engineering Document Control Actually Requires

Read the seven requirements →

Management of Change Without Losing the As-Built

Read the MOC walkthrough →

Alfresco Consulting Services and Support

See the practice this is built on →

Book the session

ECH360 Project-to-Asset Solution Workshop

Bring one real project, MDR, handover or asset scenario. We will map it against the ECH360 project-to-asset model using your numbering, metadata, document-control and governance requirements.

A completeness read, the blocking versus noise split, an operations risk list and a staged closeout sequence. Free, 60 minutes, yours to keep, no pitch.

Prefer email? Write to info@techtiera.com with the project, the milestone and the date it lands on, and we will come back with a time.

If the form does not load on your network, email info@techtiera.com with the project, the milestone and the date it lands on.

ECH360 Solution Workshop
Free, 60 minutes, yours to keep

Book